Beginning Period:   Beginning Day:       Date Event Equalization:
Ending Period:   Ending Day:      On    Off
    —   All dates correspond to the forecast's valid time   —
 Models
WRF/ARW
WRF/NMM
Eta
Verification Grid

(View verification grids)

 Precipitation grid options:
WRF12km, Eta12km
WRF05km, Eta12km           
Parameter


Level


Lead Time (fcsthr)


Observation Type


Statistic 1
Statistic 2
USER CAUTION: Comparisons of model performance can be misleading, since small differences may not be statistically significant.
Back to: DWFE User Manual RTVS & NCEP Precipitation Verification Differences